Discover the Narmada River: history, culture and the valley.Get in touch

Friends of River Narmada

Mardana Resolution (Mardana Declaration): How 296 Village Leaders United to Save Narmada

At Mardana, a small village in the Nimar region of Madhya Pradesh along the Narmada River, voices rose for local democracy. In February 2000, villagers launched a historic movement. Hundreds of elected representatives of village panchayats gathered here to adopt the Mardana Resolution, also known as the Mardana Declaration.​

This document challenged the Maheshwar Hydro-electric Project. It did not represent a government policy from above; it represented the people’s will. This declaration reflected the strength of local Panchayati Raj bodies in defending their rivers, farms, and livelihoods from irrational development activities.

Background: The Maheshwar Dam Controversy

To understand the Mardana Resolution, one needs to consider the Maheshwar Dam project. This dam project was seen as one of the key hydroelectric dams in the Narmada Valley Development Project. Unlike other state-sponsored dams, the government transferred ownership of this dam to a private company called Shree Maheshwar Hydel Power Corporation Limited (SMHPCL), set up by the S. Kumar group.​

This project was meant to generate 400 megawatts of power to promote industrial development. But the dam came with a human and ecological cost. The dam could displace more than 60 villages in the Nimar Plains, making people in those areas homeless.​

The Nimar region is well known across central India for its rich black cotton soil and year-round agriculture. Villagers in Mardana, Bakawan, and Jalud used to grow wheat, cotton, chillies, sugarcane, and pulses. They used electric pumps to draw water directly from the River Narmada. Thus, submerging this region meant destroying the livelihood of around 40,000 to 50,000 agriculturists, fishermen, labourers, and artisans.

Broken Promises and Growing Unrest

The official promise of rehabilitation was made before construction began. According to policy guidelines in India, displacing farmers meant providing them with equivalent agricultural land at least one year before submergence.

​In reality, however, the administration failed to follow these guidelines. Construction and concreting continued as builders ignored the lack of ownership certificates for thousands of families who had no alternative homes or future prospects. Whenever villagers asked questions, either company executives or local administrators remained silent.

​As frustration grew, villagers united in organised peaceful protests with support from the Narmada Bachao Andolan (NBA). Thousands of farmers protested against the injustice at the dam site.

What Happened at Mardana?

In 2000, after the formation of the new Panchayat, these people made an effort through the constitutional process. They knew this would not be enough and that they needed a written declaration.

​A massive rally took place on 17 February 2000 at the village of Mardana. A large number of people attended the rally from all the riverfront villages, arriving by tractor, bullock cart, and even on foot. In front of thousands of people, 296 elected representatives of these villages signed this historic declaration.

​The signatories included the Sarpanchs (headmen), Panchs (Ward members), and the members of Janpad and Zilla Panchayats. Together, they developed and accepted the Mardana Resolution.

Key Aspect Details of the Mardana Resolution
Date of Signing 17 February 2000
Location Mardana village, Khargone district, Madhya Pradesh
Signatories 296 elected local Panchayat representatives
Target Project Maheshwar Hydroelectric Project on the Narmada River
Core Demand Immediate halt to dam construction and cancellation of the project

Core Demands of the Mardana Declaration

The Mardana Declaration was not just a complaint, but an assertive voice taken by grassroots leaders. A number of tough demands and truths were mentioned in this declaration:

1. No other land for resettlement:

The signatories stated that the government had been unable to find other agricultural land. In a crowded area like Nimar, no other fertile land was available to resettle thousands of farming families.

2. Opposition to monetary compensation:

The villagers were not ready to accept any form of monetary compensation in lieu of land. According to farmers, money would evaporate soon, leaving rural people landless and jobless for generations to come.

3. Expensive production of electricity:

The resolution raised doubts about the dam’s feasibility from an economic point of view. Producing electricity at such a high cost was very unreasonable for the common man and the electricity board.

4. Infringement of constitutional rights:

Under Article 73 of the Constitution of India, the Panchayats administer local resources and development in the village. They argued that constructing dams without the permission of the Gram Sabha infringed on their democratic rights.

5. Stop work immediately:

The 296 members of parliament asked the Madhya Pradesh government and private contractors to stop work immediately until the matter was investigated.

The Role of Women and Local Communities

An interesting aspect of the Mardana movement was the presence of women who were residents of rural areas. Women from Nimar had been engaged in activities like cultivation, looking after livestock, and water management at home. These women knew that if the river flooded, their villages, gardens, and water sources would be destroyed.

​During the conference organised in Mardana, the women representatives made strong points about saving the Narmada River. Many women Panchs and Sarpanchs stepped forward to sign along with other male members.

National and International Impact

The Mardana Declaration made waves not just within the Narmada’s riverbeds. Because it was signed by elected representatives, it made it harder for authorities to dismiss the protests as the work of external troublemakers.​

Firstly, the statement provided additional evidence to the conclusions of an independent fact-finding team established by the Madhya Pradesh government. It visited the valley, studied the land deeds, and confirmed that the state does not have enough arable land to rehabilitate the displaced people.

​Secondly, the Mardana Declaration came to the notice of international business. At that time, some European and American corporations planned to finance or construct the Maheshwar Dam. They included German power utilities, Siemens, and even the US Ogden Corporation. The activists sent copies of the declaration to international business circles and human rights organizations.​

Foreign Entity Role in Maheshwar Project Outcome After Local Opposition
German Power Utilities (VEW & Bayernwerk) Proposed equity investors Withdrew financial support due to human rights concerns
Siemens (Germany) Equipment supplier and partner Exited the project after independent reviews
Ogden Corporation (USA) Project developer and investor Pulled out of the joint venture
Hermes (German Export Credit) Export credit guarantee agency Denied sovereign risk guarantees

Due to heavy resistance in the area and blatant human rights violations, major investors withdrew their support from 1999 to 2001. Without international funding, the Maheshwar Dam could not progress.

Legal Battles and Project Delays

After the signing of the Mardana Declaration, the battle shifted to Indian courts and regulatory bodies. The activists, along with the affected farmers, initiated several public interest litigations in the Supreme Court and high courts. This was because rehabilitation laws and environmental clearance requirements had been violated.

​Even Indian public financial institutions that had provided loans to the private organisation began to doubt the project’s viability. Construction work was repeatedly stopped due to a lack of funds, legal notices, and continuous agitation by the villagers.

Legacy of the Resolution

The Mardana Resolution is still a landmark event in India’s environmental and social history. This event demonstrated that grassroots democracy can hold corporate bodies and state mechanisms to account.

​Before 2000, there was no consultation by planners at the village council level. However, the Mardana Declaration altered this discourse. It revealed the true essence of Gram Swaraj and how local leaders may use the Constitution to safeguard their culture and environment. To date, whenever issues of land acquisition, private infrastructure, and river management have come up, Mardana has been referenced.

Conclusion

In fact, the Mardana Resolution is far from just another small-time movement against the construction of one dam. In February 2000, when the 296 elected members came together along the banks of the Narmada River, they stood up for the pride of Indian peasants and the purity of a holy river.

​By joining together, they highlighted the weaknesses of speedy, privatised dam construction and put global investors on notice. In conclusion, the lesson learned through the Mardana Declaration is that true development will not arise from submerging productive lands and ignoring local voices.

FAQs

1. What is the Mardana Resolution?

The Mardana Resolution, or Mardana Declaration, is a widely recognised resolution passed on 17 February 2000 in Mardana village, Madhya Pradesh. In the Mardana Resolution, the locally elected representatives refused to accept the Maheshwar Hydroelectric Project on the Narmada River.

2. Who signed the Mardana Declaration?

The 296 elected Panchayati Raj representatives from the affected Nimar region signed the resolution. The signatories included Sarpanchs (village heads), Panchs (ward members), and members of Janpad and Zilla Panchayats.

3. Why did local leaders oppose the Maheshwar Dam?

The Maheshwar Dam threatened to flood more than 60 productive villages and uproot about 40,000 to 50,000 farmers and fishermen. The local leadership rejected the project because the government did not offer any other land for rehabilitation.

4. Why did farmers refuse cash compensation?

Farming communities rejected the monetary compensation because money is easily exhausted, and they would be landless forever, losing their means of earning a livelihood. They sought fertile farmland in lieu of the inundated land.​

5. How did the Mardana Resolution affect the Maheshwar Dam project?

This decision showed that not only did activists oppose the project, but the elected representatives of the villages also opposed it. It meant that foreign investors from Germany and the United States stopped funding the project from 1999 to 2001.