Discover the Narmada River: history, culture and the valley.Get in touch

Friends of River Narmada

Maheshwar Dam: History, Location and Importance

The Maheshwar Dam is a major hydroelectric project on the Narmada River at Maheshwar in MP. Its primary objective was to generate power for the state. The project was envisaged at 400 MW. It was also the project which became the subject of considerable controversy with regard to the displacement of people, the environment, the cost overruns and the delays in construction. It is one of the more talked-about hydro projects in the Narmada Valley.

History and Background of Maheshwar Dam

This is a large hydroelectric project on the Narmada River in Madhya Pradesh, India. It was intended to generate power and facilitate the development of the area. Construction started in the 1990s, but it ran into a host of problems, including financial problems, protests and environmental issues. It became one of the most contentious dam projects in the Narmada Valley.

Mahashwar Dam Details: 

  • Location: Khargone, Madhya Pradesh
  • River: Narmada
  • Project Type: Hydroelectric
  • Capacity: 400 MW
  • Turbines: 10
  • Dam Height: 35–36 metres
  • Power Capacity: Planned capacity of 400 MW

Construction and Development of Maheshwar Bandh

The Maheshwar Dam project was initiated in the 1990s as part of the scheme for the development of hydroelectric power in MP. It was to be a concrete dam with a power station having 10 generating units of 40 MW each (so a total capacity of 400 MW). Construction was beset with problems due to financial difficulties, protests and the rehabilitation of the people who were affected.

Main Purpose of Building Maheshwar Bandh

The main purpose behind the construction of this is to produce electricity from the water of the Narmada River. This would supply electricity to Madhya Pradesh, helping to develop industries and the economy. Electricity can also be supplied to nearby areas to meet increasing electricity demands in the state.

Role of Maheshwar Dam in Hydroelectric Power Generation

 It was a hydroelectric project of 400 MW in capacity, designed to use the flow of water from the Narmada River to run the turbines and produce electricity. The electricity generated was to be used to power homes, industry, business and agriculture. It has been a very delayed project and is not, in fact, a working power station.

Tributaries of Maheshwar Dam

Maheshwar Dam is built on the Narmada River in Madhya Pradesh. Some important tributaries of the Narmada River in its basin include:

Major Tributaries of the Narmada River

  • 1. The Karam River is a tributary flowing into the Narmada River in Madhya Pradesh. The river provides water to the Narmada water system and helps in agriculture
  • 2. The Goit River is a small river that flows into the Narmada River. It flows through some parts of Madhya Pradesh and provides water to the main river.
  • 3. The Hiran River is one of the tributaries of the Narmada River. The river flows through Madhya Pradesh.
  • 4. The Tawa River is an important tributary. The river merges with the Narmada River near Bandhavgarh, Madhya Pradesh. It is also linked with the Tawa Dam.
  • 5. The Barna River is a tributary of the Narmada River in Madhya Pradesh. It helps provide water for the local area.
  • 6. The Kolar River is another tributary. The river flows through Madhya Pradesh. It is connected to the Kolar Dam, which allows water to be provided to nearby areas.

Importance of the Narmada River in the Project

The Narmada is a major river in central India and forms the basis of the Maheshwar Dam project, as it is the source of the water required for power generation. It is a major river in the region and supports agriculture, fishing, drinking water and the lives of many people. The project was conceived as one which would use the water of the Narmada for power generation.

Benefits of maheshwar bandh for Madhya Pradesh

The Maheshwar Dam project was expected to provide several benefits to Madhya Pradesh:

  • Generate up to 400MW of electricity.
  • Support the electricity requirements of homes and industry.
  • Help improve the state’s power supply.
  • Encourage industrial development.
  • Create employment during both the construction and the operation phases.
  • Support the economic development of the region.

However, these benefits were the sort of thing you’d expect as an outcome rather than actually having been achieved.

History of Maheshwar Bandh

This project was conceived in 1978 on the Narmada River in Madhya Pradesh as part of the Narmada Valley Development Project for power generation. Responsibility for the project passed to the Madhya Pradesh Electricity Board in 1989 and, in 1993, to Shree Maheshwar Hydel Power Corporation Limited.

In 1994, the project got environmental clearance. Construction was beset with a number of problems, though, primarily financial problems, protests from the local people and issues relating to land, displacement and rehabilitation, which led to a number of delays. The Madhya Pradesh government terminated the project’s power purchase agreement in April 2020, and as a result, the 400 MW project remained incomplete.

Impact of Maheshwar Bandh on Local Communities

The building of the dam had a direct impact on the people living along the Narmada. Many of them were farmers, fishermen and small entrepreneurs. The project raised all sorts of issues in terms of people losing their homes, their farmland, and their way of life. There were also concerns about the loss of the social and cultural fabric of the community with respect to the river.

Displacement of Villages and Rehabilitation Issues

One of the major issues with the Maheshwar Dam was the displacement of people from the villages in the vicinity of the project area. The rising water level was going to submerge homes, agricultural land and village properties. There were numerous families who were demanding proper compensation, land and rehabilitation. There were protests as the people felt that their rights and means of livelihood were not being adequately protected.

Environmental Impact of Maheshwar Dam

The project raised several environmental concerns:

  • Submergence of agricultural land and natural areas.
  • Changes in the natural flow of the Narmada River.
  • Possible effects on fish and other aquatic life.
  • Loss of trees and vegetation in the affected areas.
  • Changes in the river ecosystem.

Effects on the people who depend on the river for their livelihoods.

Protests and Controversies 

 It was the subject of considerable controversy, with protests coming from the local people, the farmers, the environmental groups and the social activists. The opposition to the project stemmed from the issue of displacement, inadequate rehabilitation, environmental damage and the cost of electricity. The Narmada Bachao Andolan had also raised the issue of the rights of the people who were affected by large dam projects in the Narmada Valley.

Current Status and Challenges of Maheshwar Bandh

The Maheshwar Bandh project has had its fair share of financial, legal and construction problems. After all this time, the 400MW hydro project is still not up and running. There have been financial problems, changes in ownership and rehabilitation issues to contend with. Its future is very much tied up in overcoming these problems and finishing the remainder of the project work.

FAQs

Q1. Where is the Maheshwar Dam located?

This is on the Narmada River near Maheshwar town in the Khargone district of Madhya Pradesh, India.

Q2. What is the primary purpose of the Maheshwar Dam?

The project is essentially to generate hydroelectricity from the water of the Narmada. It’s a 400 MW project.

Q3. How much electricity was the Maheshwar Dam intended to generate?

It was to be a 400 MW plant with 10 x 40 MW generating units.

Q4. Why did people protest against the Maheshwar Dam?

People were against the project on grounds of village displacement, loss of farmland, environmental issues and the need for adequate compensation and rehabilitation.

Q5. Is the Maheshwar Dam fully functional?

No. The Maheshwar hydroelectric project has faced long delays and has not become fully operational as originally planned.

Q6. Who developed the Maheshwar Dam project?

The Maheshwar Dam project was handed over to Shree Maheshwar Hydel Power Corporation Limited in 1993. The company was responsible for developing the hydroelectric project.

Q7. Why was Maheshwar Dam planned?

It was planned to generate electricity using the water of the Narmada River. Its main aim was to improve the electricity supply in Madhya Pradesh.

Q8. How many gates does Maheshwar Dam have?

 It was designed with 27 radial gates. These gates help control the flow of water through the dam.

Q9. What problems did the Maheshwar Dam project face?

The project could not be completed due to a lack of money, delays in construction and protests by local people who lost their homes, land and jobs.

Q10. How many turbines were there going to be at Maheshwar Dam?

In total, there were going to be 10 turbines. Each turbine produces 40MW of electricity. This means in total, they can produce 400MW of electricity.