water that would be available before the further reaches of the canal were built, how will it be taken away from them? Irrigation: Conclusions
It is clear that the irrigation benefits of the SSP have been vastly exaggerated. The project will not only be unable to irrigate 1.8 million ha, it may have water to reach only 44-52% of that area. Large parts of the command are unsuitable for irrigation, and waterlogging and salinisation are bound to occur. Prospects of failure loom large, magnified by the absence of the Narmada Sagar Project. Rich and powerful central Gujarat will definitely benefit in the short run, before waterlogging and salinisation lays waste its fields forever, but the drought-hit will be left high and dry.
|